Eclipse Installation & Operations Manual
4
after all other pool equipment (pump, filter, heater, and cleaner).
Figure 2 shows the most basic installation. For installation with
additional sanitizers and pool cleaners, refer to Appendix A.
Locate an appropriate section of the return line and install the
injector manifold with PVC cement. Be very careful to observe and
follow the correct water flow direction (as indicated by the arrow on
the injector manifold).
2D-2. Water Check Valve
If the pool equipment is mounted above the water line, a check
valve must be installed between the pump outlet and the Injector
Manifold. This will prevent the pump from draining and losing its
prime (when not in use).
Note: If a 1/3# DELCheck
TM
is used, do not install immediately after
chlorine feeders.
2D-3. Pressure Test
If a pressure test is required, it should be performed prior to
connecting the Ozone Gas Line. Install the 3/4” pipe cap provided
onto the Injector for the pressure test.
Figure 2: Injector Manifold Mounting Location
WATER FLOW
Pool
Pump
Filter
Heater
Eclipse
System
Injector
Manifold